SEWARD HIGHWAY over OMALLEY UNDERCROSSING

MILE POINT 119.8 · County 020, Alaska · Built 1978 · 4 Lanes · 31,400 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
1380
Year Built
1978
Length
51.8 m (169.9 ft)
Max Span
25.1 m
Width
30.7 m (100.7 ft)
Lanes
4
Daily Traffic
31,400
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.