SEWARD HIGHWAY over DOWLING RD UNDERXING

MILE POINT 122.8 · County 020, Alaska · Built 2022 · 6 Lanes · 47,700 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
1324
Year Built
2022
Length
44.5 m (146 ft)
Max Span
43.3 m
Width
42.8 m (140.4 ft)
Lanes
6
Daily Traffic
47,700
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.