DALTON HIGHWAY over SOUTH FORK KOYUKUK RIVER

MILE POINT 155.8 · County 290, Alaska · Built 1972 · 2 Lanes · 140 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 6 Satisfactory

Location

67.029503, -150.296528

This bridge is in worse condition than 46.8% of bridges in County 290. The average bridge in Alaska is 0 years old; this one is 54 years old.

Bridge Details

Structure #
1260
Year Built
1972
Reconstructed
1992
Length
128.9 m (422.9 ft)
Max Span
18.3 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
140
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.