EDGERTON/MCCARTHY over CHOKOSNA RIVER

MILE POINT 60.3 · County 066, Alaska · Built 2021 · 2 Lanes · 70 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

61.455278, -143.763889

This bridge is in worse condition than 7.5% of bridges in County 066. The average bridge in Alaska is 0 years old; this one is 5 years old.

Nearby Bridges

Bridge Details

Structure #
1193
Year Built
2021
Length
44.5 m (146 ft)
Max Span
43.1 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
70
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.