EGAN DRIVE over SALMON CREEK

MILE POINT 3.4 · County 110, Alaska · Built 1973 · 7 Lanes · 13,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
1188
Year Built
1973
Length
36.9 m (121.1 ft)
Max Span
18.3 m
Width
40.4 m (132.5 ft)
Lanes
7
Daily Traffic
13,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.