CROW CREEK ROAD over CROW CREEK
MILE POINT 4.9 · County 020, Alaska · Built 1950 · 1 Lanes · 410 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
61.0214, -149.0952
This bridge is in worse condition than 89.6% of bridges in County 020. The average bridge in Alaska is 0 years old; this one is 76 years old.
Nearby Bridges
NO DATA ENTERED over MILK CREEK
Built 1980
CROW CREEK ROAD over CALIFORNIA CREEK
Built 2008
ALYESKA HIGHWAY over GLACIER CREEK
Built 1967
ALYESKA HIGHWAY over GIRDWOOD OVERHEAD
Built 1967
SEWARD HIGHWAY over TIDEWATER SLOUGH
Built 1995
SEWARD HIGHWAY over BIRD POINT OVERHEAD
Built 1998
SEWARD HIGHWAY over GLACIER CREEK
Built 2019
SEWARD HIGHWAY over VIRGIN CREEK
Built 2019
SEWARD HIGHWAY over PETERSON CREEK
Built 2019
Bridge Details
- Structure #
- 1028
- Year Built
- 1950
- Length
- 24.6 m (80.7 ft)
- Max Span
- 24.3 m
- Width
- 5.2 m (17.1 ft)
- Lanes
- 1
- Daily Traffic
- 410
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.