3015000-6.44 over MOD
THORNE BAY · County 198, Alaska · Built 1981 · 1 Lanes · 5 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
55.788133, -132.669314
This bridge is in worse condition than 80.1% of bridges in County 198. The average bridge in Alaska is 0 years old; this one is 45 years old.
Nearby Bridges
3015600-1.15 over NO DATA ENTERED
Built 2003
3015100-0.60 over LOG
Built 1995
3017000 over MOD
Built 1991
THORNE BAY ROAD over FALLS CREEK
Built 1975
THORNE BAY ROAD over GRAVELLY CREEK
Built 1989
THORNE BAY ROAD over THORNE RIVER
Built 1975
3000000-28.30 over PERM
Built 1991
NO DATA ENTERED over NO DATA ENTERED
Built 2018
NO DATA ENTERED over STREAM
Built 2003
3000000-37.75 over PERM
Built 1991
Bridge Details
- Structure #
- 100540000001098
- Year Built
- 1981
- Reconstructed
- 2004
- Length
- 21.3 m (69.9 ft)
- Max Span
- 20.9 m
- Width
- 5.5 m (18 ft)
- Lanes
- 1
- Daily Traffic
- 5
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- $160,000
- Total Project Cost
- $180,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.