2000000-124.232 over PERM 124.232

LAB BAY · County 198, Alaska · Built 1987 · 1 Lanes · 10 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

56.328281, -133.493411

This bridge is in worse condition than 12.4% of bridges in County 198. The average bridge in Alaska is 0 years old; this one is 39 years old.

Nearby Bridges

Bridge Details

Structure #
100540000001013
Year Built
1987
Length
32 m (105 ft)
Max Span
31.2 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
10
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
$50,000
Total Project Cost
$70,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.