ROAD over STREAM -1990
EIGHT FATHOM BIGHT · County 105, Alaska · Built 1979 · 1 Lanes
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
58.109211, -135.865156
This bridge is in worse condition than 81.6% of bridges in County 105. The average bridge in Alaska is 0 years old; this one is 47 years old.
Nearby Bridges
ROAD over STREAM -1990
Built 1990
ROAD over NEKA RIVER
Built 1986
ROAD over MUD BAY FORK
Built 1977
ROAD over STREAM -1990
Built 1990
LOGGING ROAD over MUD RIVER
Built 1992
ROAD over NEKA RIVER
Built 1986
ROAD over TRIB TO NEKA RIVER
Built 1986
ROAD over STREAM -1990
Built 1990
ROAD over STREAM -1977
Built 1977
ROAD over STREAM -1977
Built 1990
Bridge Details
- Structure #
- 100320000001265
- Year Built
- 1979
- Reconstructed
- 1999
- Length
- 15.2 m (49.9 ft)
- Max Span
- 14.8 m
- Width
- 5.5 m (18 ft)
- Lanes
- 1
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- $26,000
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.