TAYLOR HIGHWAY over AMERICAN CREEK NO 1

MILE POINT 149.8 · County 240, Alaska · Built 1988 · 2 Lanes · 20 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 4 Poor

Location

64.726783, -141.259933

This bridge is in worse condition than 89.1% of bridges in County 240. The average bridge in Alaska is 0 years old; this one is 38 years old.

Nearby Bridges

Bridge Details

Structure #
0841
Year Built
1988
Length
33.5 m (109.9 ft)
Max Span
33.2 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
20
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.