ELLIOTT HIGHWAY over CHATANIKA RIVER
MILE POINT 10.5 · County 090, Alaska · Built 1971 · 2 Lanes · 910 vehicles/day
Overall
Deck
9
Excellent
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
65.085525, -147.725661
This bridge is in worse condition than 50% of bridges in County 090. The average bridge in Alaska is 0 years old; this one is 55 years old.
Bridge Details
- Structure #
- 0836
- Year Built
- 1971
- Reconstructed
- 2019
- Length
- 75.9 m (249 ft)
- Max Span
- 25 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 910
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.