STEESE HIGHWAY over MCKAY CREEK
MILE POINT 41.0 · County 090, Alaska · Built 1967 · 2 Lanes · 120 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
65.221853, -147.157853
This bridge is in worse condition than 50% of bridges in County 090. The average bridge in Alaska is 0 years old; this one is 59 years old.
Bridge Details
- Structure #
- 0823
- Year Built
- 1967
- Length
- 33.7 m (110.6 ft)
- Max Span
- 16.8 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 120
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.