MARINE HWY ROUTE over SKAGWAY FERRY TERMINAL
SKAGWAY · County 230, Alaska · Built 1980 · 1 Lanes · 947 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
59.449194, -135.324786
This bridge is in worse condition than 83.3% of bridges in County 230. The average bridge in Alaska is 0 years old; this one is 46 years old.
Bridge Details
- Structure #
- 0805
- Year Built
- 1980
- Reconstructed
- 1994
- Length
- 53.3 m (174.9 ft)
- Max Span
- 42.7 m
- Width
- 5.2 m (17.1 ft)
- Lanes
- 1
- Daily Traffic
- 947
- Material
- Steel
- Design
- Orthotropic
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.