TOK CUTOFF over SLANA SLOUGH
MILE POINT 74.8 · County 066, Alaska · Built 2006 · 2 Lanes · 220 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
62.886658, -143.677331
This bridge is in worse condition than 28.3% of bridges in County 066. The average bridge in Alaska is 0 years old; this one is 20 years old.
Bridge Details
- Structure #
- 0655
- Year Built
- 2006
- Length
- 37.2 m (122 ft)
- Max Span
- 35.7 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 220
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.