SEWARD HIGHWAY over VICTOR CREEK

MILE POINT 19.4 · County 122, Alaska · Built 2023 · 2 Lanes · 1,700 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
0607
Year Built
2023
Length
68.3 m (224.1 ft)
Max Span
32.9 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
1,700
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.