RICHARDSON HIGHWAY over HAGGARD CREEK

MILE POINT 163.7 · County 066, Alaska · Built 2021 · 2 Lanes · 330 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 8 Very Good

Location

62.696592, -145.448906

This bridge is in worse condition than 13.2% of bridges in County 066. The average bridge in Alaska is 0 years old; this one is 5 years old.

Bridge Details

Structure #
0576
Year Built
2021
Length
40.8 m (133.9 ft)
Max Span
39.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
330
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.