RICHARDSON HIGHWAY over HAGGARD CREEK
MILE POINT 163.7 · County 066, Alaska · Built 2021 · 2 Lanes · 330 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 8 | Very Good |
Location
62.696592, -145.448906
This bridge is in worse condition than 13.2% of bridges in County 066. The average bridge in Alaska is 0 years old; this one is 5 years old.
Bridge Details
- Structure #
- 0576
- Year Built
- 2021
- Length
- 40.8 m (133.9 ft)
- Max Span
- 39.4 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 330
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.