GLENN HIGHWAY over CHICKALOON RIVER

MILE POINT 70.5 · County 170, Alaska · Built 2016 · 2 Lanes · 1,110 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

61.786317, -148.457778

This bridge is in worse condition than 30.6% of bridges in County 170. The average bridge in Alaska is 0 years old; this one is 10 years old.

Nearby Bridges

Bridge Details

Structure #
0545
Year Built
2016
Length
107.6 m (353 ft)
Max Span
45.7 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
1,110
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.