ALASKA HIGHWAY over CHIEF CREEK

MILE POINT 134.6 · County 240, Alaska · Built 1985 · 2 Lanes · 190 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 6 Satisfactory
Substructure 8 Very Good

Location

63.628767, -144.015397

This bridge is in worse condition than 37.5% of bridges in County 240. The average bridge in Alaska is 0 years old; this one is 41 years old.

Nearby Bridges

Bridge Details

Structure #
0514
Year Built
1985
Length
12.5 m (41 ft)
Max Span
12.2 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
190
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A