IRR:JAKOLOF BAY RD over BARABARA CREEK
MILE POINT 4.4 · County 122, Alaska · Built 1968 · 2 Lanes · 110 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
59.478353, -151.645089
This bridge is in worse condition than 88.2% of bridges in County 122. The average bridge in Alaska is 0 years old; this one is 58 years old.
Bridge Details
- Structure #
- 0433
- Year Built
- 1968
- Length
- 21.9 m (71.9 ft)
- Max Span
- 21.3 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 110
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.