IRR:JAKOLOF BAY RD over BARABARA CREEK

MILE POINT 4.4 · County 122, Alaska · Built 1968 · 2 Lanes · 110 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
4
Poor

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 4 Poor
Substructure 4 Poor

Location

59.478353, -151.645089

This bridge is in worse condition than 88.2% of bridges in County 122. The average bridge in Alaska is 0 years old; this one is 58 years old.

Nearby Bridges

Bridge Details

Structure #
0433
Year Built
1968
Length
21.9 m (71.9 ft)
Max Span
21.3 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
110
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.