MISSION AVENUE over NINILCHIK RIVER
MILE POINT 0.2 · County 122, Alaska · Built 2014 · 2 Lanes · 180 vehicles/day
Overall
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 8 | Very Good |
| Substructure | 9 | Excellent |
Location
60.048389, -151.665089
This bridge is in worse condition than 21.6% of bridges in County 122. The average bridge in Alaska is 0 years old; this one is 12 years old.
Bridge Details
- Structure #
- 0427
- Year Built
- 2014
- Length
- 39 m (128 ft)
- Max Span
- 37.8 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 180
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.