IRR:NOME-TELLER RD over FEATHER RIVER
MILE POINT 36.4 · County 180, Alaska · Built 1967 · 2 Lanes · 20 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
64.828978, -166.094533
This bridge is in worse condition than 10% of bridges in County 180. The average bridge in Alaska is 0 years old; this one is 59 years old.
Bridge Details
- Structure #
- 0421
- Year Built
- 1967
- Length
- 55 m (180.4 ft)
- Max Span
- 18.3 m
- Width
- 9 m (29.5 ft)
- Lanes
- 2
- Daily Traffic
- 20
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.