EDGERTON/MCCARTHY over TONSINA RIVER
MILE POINT 19.2 · County 066, Alaska · Built 1976 · 2 Lanes · 440 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
61.651789, -144.6482
This bridge is in worse condition than 73.6% of bridges in County 066. The average bridge in Alaska is 0 years old; this one is 50 years old.
Bridge Details
- Structure #
- 0288
- Year Built
- 1976
- Length
- 107 m (351 ft)
- Max Span
- 35.7 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 440
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.