TAYLOR HIGHWAY over TAYLOR CREEK
MILE POINT 50.3 · County 240, Alaska · Built 1977 · 2 Lanes · 160 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 4 | Poor |
Location
63.924817, -142.200622
This bridge is in worse condition than 89.1% of bridges in County 240. The average bridge in Alaska is 0 years old; this one is 49 years old.
Bridge Details
- Structure #
- 0277
- Year Built
- 1977
- Reconstructed
- 2023
- Length
- 18.4 m (60.4 ft)
- Max Span
- 17.3 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 160
- Material
- Steel
- Design
- Truss - Thru
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.