TAYLOR HIGHWAY over TAYLOR CREEK

MILE POINT 50.3 · County 240, Alaska · Built 1977 · 2 Lanes · 160 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
4
Poor

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 4 Poor

Location

63.924817, -142.200622

This bridge is in worse condition than 89.1% of bridges in County 240. The average bridge in Alaska is 0 years old; this one is 49 years old.

Nearby Bridges

Bridge Details

Structure #
0277
Year Built
1977
Reconstructed
2023
Length
18.4 m (60.4 ft)
Max Span
17.3 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
160
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.