IRR:NOME-COUNCIL over FOX RIVER
MILE POINT 66.0 · County 180, Alaska · Built 1982 · 2 Lanes · 160 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
64.819217, -163.721572
This bridge is in worse condition than 10% of bridges in County 180. The average bridge in Alaska is 0 years old; this one is 44 years old.
Nearby Bridges
Bridge Details
- Structure #
- 0268
- Year Built
- 1982
- Length
- 36.6 m (120.1 ft)
- Max Span
- 18 m
- Width
- 7.6 m (24.9 ft)
- Lanes
- 2
- Daily Traffic
- 160
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.