IRR:MARINE HWY RTE over CHENEGA DOCK
CHENEGA BAY · County 063, Alaska · Built 1995 · 1 Lanes · 10 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
60.066672, -148.010175
This bridge is in worse condition than 40% of bridges in County 063. The average bridge in Alaska is 0 years old; this one is 31 years old.
Bridge Details
- Structure #
- 0184
- Year Built
- 1995
- Length
- 163.1 m (535.1 ft)
- Max Span
- 13.7 m
- Width
- 12.2 m (40 ft)
- Lanes
- 1
- Daily Traffic
- 10
- Material
- Steel
- Design
- Box Beam or Girders - Multiple
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.