IRR:FERRY ACCESS over ANGOON FERRY TERMINAL

ANGOON · County 105, Alaska · Built 2011 · 1 Lanes · 31 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 6 Satisfactory

Location

57.472683, -134.567586

This bridge is in worse condition than 55.3% of bridges in County 105. The average bridge in Alaska is 0 years old; this one is 15 years old.

Bridge Details

Structure #
0181
Year Built
2011
Length
41.8 m (137.1 ft)
Max Span
41.8 m
Width
5.5 m (18 ft)
Lanes
1
Daily Traffic
31
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.