IRR BIA RTE 27 over UNNAMED STREAM
2.8KM NORTH OF LANDFILL · County 198, Alaska · Built 1980 · 1 Lanes · 1 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
57.008189, -133.871381
This bridge is in worse condition than 93.4% of bridges in County 198. The average bridge in Alaska is 0 years old; this one is 46 years old.
Nearby Bridges
IRR BIA RTE 27 over GUNNUK CREEK TRIBUTARY
Built 1980
IRR BIA RTE 27 over GUNNUK CREEK
Built 1980
IRR BIA RTE 27 over JENNY CREEK
Built 1980
IRR:PTRSBG/KAKE RD over GUNNUK CREEK
Built 1981
IRR BIA RTE 22 over SMALL POINT CREEK
Built 1980
IRR:FT SPUR ROAD over KAKE FERRY TERMINAL
Built 2015
IRR BIA RTE 24 over UNNAMED STREAM
Built 1980
IRR:KEKU RD (KAKE) over SITKUM CREEK
Built 2011
IRR BIA RTE 22 over UNNAMED STREAM
Built 1980
IRR BIA RTE 26 over UNNAMED STREAM
Built 1980
Bridge Details
- Structure #
- 0000E09229T0270
- Year Built
- 1980
- Length
- 12 m (39.4 ft)
- Max Span
- 11 m
- Width
- 6.5 m (21.3 ft)
- Lanes
- 1
- Daily Traffic
- 1
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $275,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.