ANDREWS AVE over WHITAKER CREEK
GOLD COURSE DAM UPSTREAM · County 045, Alabama · Built 1977 · 2 Lanes · 540 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
31.3668, -85.7051
This bridge is in worse condition than 90.8% of bridges in County 045. The average bridge in Alabama is 0 years old; this one is 49 years old.
Nearby Bridges
FORESTRY ACESS RD over WHITAKER CRK
Built 1995
AIRPORT ROAD over CLAYBANK CREEK TRIB
Built 1978
CHRISTIAN RD over WHITTAKER CRK
Built 1977
ARTILLERY ROAD over TRIB CLAYBANK CRK
Built 1959
CHRISTIAN RD over CLAYBANK CRK
Built 1956
FARRELL RD over CLAYBANK CREEK
Built 1976
CHRISTIAN RD over STEEPHEAD CRK
Built 1977
ECH RD over BLACKS MILL CRK
Built 1976
FORESTRY ACCESS rd over BROOKINGMILL CRK
Built 2010
ENGINEER RD over DILLY BRANCH
Built 1975
Bridge Details
- Structure #
- DAPTRARUC020050
- Year Built
- 1977
- Length
- 9.8 m (32.2 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 540
- Material
- Concrete
- Design
- Culvert
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $15,000
- Total Project Cost
- $17,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.