AUM East Road over Branch

0.2 mi from end of road · County 101, Alabama · Built 1976 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 7 Good

Location

32.361944, -86.178333

This bridge is in worse condition than 57.1% of bridges in County 101. The average bridge in Alabama is 0 years old; this one is 50 years old.

Nearby Bridges

Bridge Details

Structure #
021847
Year Built
1976
Length
21.2 m (69.6 ft)
Max Span
7.1 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
200
Material
Concrete
Design
Channel Beam
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$536,000
Total Project Cost
$590,000