Pike Ackert RD over Unamed
_ · County 089, Alabama · Built 2023 · 2 Lanes · 100 vehicles/day
Overall
Culvert
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 9 | Excellent |
This bridge is in worse condition than 42% of bridges in County 089. The average bridge in Alabama is 0 years old; this one is 3 years old.
Bridge Details
- Structure #
- 021766
- Year Built
- 2023
- Length
- 9.8 m (32.2 ft)
- Max Span
- 8 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $854,000
- Total Project Cost
- $939,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.