Industrial Blvd over CSX Railroad

0.5 miles East of Hwy 31 · County 043, Alabama · Built 1998 · 2 Lanes · 500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
021727
Year Built
1998
Length
36 m (118.1 ft)
Max Span
35.4 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
500
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,237,000
Total Project Cost
$1,361,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.