Dupree Hollow Rd over Double Branch

_T.1S. R.5W. SEC 31 · County 083, Alabama · Built 2022 · 2 Lanes · 121 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
021700
Year Built
2022
Length
6.2 m (20.3 ft)
Max Span
2.4 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
121
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$215,000
Total Project Cost
$237,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.