North River Rd over Keller Creek
300 south of Keller Rd · County 003, Alabama · Built 2023 · 2 Lanes · 750 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
This bridge is in worse condition than 38.5% of bridges in County 003. The average bridge in Alabama is 0 years old; this one is 3 years old.
Bridge Details
- Structure #
- 021636
- Year Built
- 2023
- Length
- 24.4 m (80.1 ft)
- Max Span
- 24.4 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 750
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $816,000
- Total Project Cost
- $898,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.