CO. 2_ over Southern Railroad

WAVERLY_ · County 017, Alabama · Built 2022 · 2 Lanes · 25 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
021622
Year Built
2022
Length
47.2 m (154.9 ft)
Max Span
47.2 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
25
Material
Steel
Design
Other
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$941,000
Total Project Cost
$1,035,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.