CHEROKEE TRAIL over Wallahatchee Creek

SEC 4 T18N R21E · County 051, Alabama · Built 2021 · 2 Lanes · 668 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
021609
Year Built
2021
Length
20.1 m (65.9 ft)
Max Span
4.9 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
668
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$671,000
Total Project Cost
$738,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.