CR 59 over U.T. Conecuh River

Point A Road · County 039, Alabama · Built 2020 · 2 Lanes · 850 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
021565
Year Built
2020
Length
26.8 m (87.9 ft)
Max Span
12.2 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
850
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$740,000
Total Project Cost
$814,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.