IN-85 over LONG ST

_JCT Long Street I-85 · County 081, Alabama · Built 2022 · 2 Lanes · 60,981 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
021511
Year Built
2022
Length
54.9 m (180.1 ft)
Max Span
24.4 m
Width
37.7 m (123.7 ft)
Lanes
2
Daily Traffic
60,981
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,497,000
Total Project Cost
$6,047,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.