SR-304 over Swan Creek (Relief)

0.3M W SR-304/I-65 · County 083, Alabama · Built 2023 · 2 Lanes · 9,052 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
021509
Year Built
2023
Length
48.8 m (160.1 ft)
Max Span
24.4 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
9,052
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,534,000
Total Project Cost
$1,687,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.