CR-21 over SATILPA CREEK (RELIEF)

1.38 Mi SE JCT CR21&SR154 · County 025, Alabama · Built 1963 · 2 Lanes · 160 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
021432
Year Built
1963
Reconstructed
2020
Length
61 m (200.1 ft)
Max Span
12.2 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
160
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,468,000
Total Project Cost
$1,615,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.