Craft Highway over Toulmin Springs

_0.4 MI N OF US45 · County 097, Alabama · Built 2022 · 2 Lanes · 3,009 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
021407
Year Built
2022
Length
12.2 m (40 ft)
Max Span
9.8 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
3,009
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$415,000
Total Project Cost
$457,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.