Trojan Parkway over Branch

City of Troy · County 109, Alabama · Built 2017 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
021397
Year Built
2017
Length
12.2 m (40 ft)
Max Span
12.2 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
200
Material
Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$571,000
Total Project Cost
$628,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.