_Paradise point DR over _UT to lay lake

_0.3 mile from CR 28 · County 117, Alabama · Built 1988 · 2 Lanes · 75 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
021386
Year Built
1988
Length
7.1 m (23.3 ft)
Max Span
1.7 m
Lanes
2
Daily Traffic
75
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$389,000
Total Project Cost
$428,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.