Co. Route 11 over Beaver Dam Branch

1.01m S Rumley Cemetary · County 099, Alabama · Built 2017 · 1 Lanes · 50 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
021382
Year Built
2017
Length
18 m (59.1 ft)
Max Span
4.3 m
Width
5 m (16.4 ft)
Lanes
1
Daily Traffic
50
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$275,000
Total Project Cost
$303,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.