Nick Davis Road over Swan Creek (Relief)

.3 Mi. E. US 31 · County 083, Alabama · Built 2020 · 2 Lanes · 9,160 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

34.796417, -86.95125

This bridge is in worse condition than 44.9% of bridges in County 083. The average bridge in Alabama is 0 years old; this one is 6 years old.

Nearby Bridges

Bridge Details

Structure #
021376
Year Built
2020
Length
54.9 m (180.1 ft)
Max Span
18.3 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
9,160
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,698,000
Total Project Cost
$1,868,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.