_Top Golf DR over Canal

_0.5 mile south u.s. 72 · County 089, Alabama · Built 2017 · 3 Lanes · 150 vehicles/day

Overall
Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
021374
Year Built
2017
Length
8.5 m (27.9 ft)
Max Span
8.5 m
Width
10.7 m (35.1 ft)
Lanes
3
Daily Traffic
150
Material
Concrete
Design
Arch - Deck
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$365,000
Total Project Cost
$402,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.