Thach Rd over Fall Branch

_0.7 MI. S.E. AL.HWY.251 · County 083, Alabama · Built 2022 · 2 Lanes · 131 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
021263
Year Built
2022
Length
10.5 m (34.4 ft)
Max Span
10.5 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
131
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$318,000
Total Project Cost
$350,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.