Clolinger road over Stream

200 east of Industrial · County 025, Alabama · Built 2020 · 2 Lanes · 861 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
021232
Year Built
2020
Length
20.7 m (67.9 ft)
Max Span
10.4 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
861
Material
Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$623,000
Total Project Cost
$685,000