Old Hwy US-431 over Flint River (MC)

_ · County 089, Alabama · Built 2021 · 2 Lanes · 1,000 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
021200
Year Built
2021
Length
97.5 m (319.9 ft)
Max Span
24.4 m
Width
14.8 m (48.6 ft)
Lanes
2
Daily Traffic
1,000
Material
Concrete
Design
Other
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$3,520,000
Total Project Cost
$3,872,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.