CR 64 over Drainage

1.9 M. E. of Hwy. 59 · County 003, Alabama · Built 2017 · 2 Lanes · 1,576 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
021106
Year Built
2017
Length
6.2 m (20.3 ft)
Max Span
3 m
Lanes
2
Daily Traffic
1,576
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$222,000
Total Project Cost
$244,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.