CR214 over Spur of Mulberry Creek

CR214 1.3MS CAMPBELLAIRPT · County 021, Alabama · Built 2017 · 2 Lanes · 14 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
021088
Year Built
2017
Length
20.7 m (67.9 ft)
Max Span
10.4 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
14
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$584,000
Total Project Cost
$642,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.